I look forward to a call to discuss how to make our efforts suit the program qualifications.

If the team chooses to form an unincorporated consortium with a university or non-profit as the consortium  lead or representative, then the cost share of the other universities or non-profits in the consortium may be aggregated to meet the 50% project work requirement. Transportation Development Credits are not allowable as cost share for this FOA.

We are submitting as 2 small businesses.

Any guidance on whether this type of project would be eligible for funding under AOI 13 would be appreciated.".

“The cost share must be at the required percentages identified in the table below and is calculated based on the total allowable costs (i.e., the sum of the Government share, including FFRDC costs if applicable, and the recipient share of allowable costs equals the total allowable cost of the project) and must come from non-federal sources unless otherwise allowed by law. If so, at what percentage of total project costs. 2. In addition, the deadline for submitting a Concept Paper has elapsed. Based on the answer to question 4, we believe that because the lead FFRDC would have only 25% of the work, the reduced cost-share requirement does not apply, even though 75% of the work would be conducted by non-profits.

1.

(are there any National Labs/FFRDCs that are not non-profit? Section II.B.ii of the FOA states that each project team is free to determine how to best allocate the cost share requirement among the team members. is complete.

Please see the scenarios below - Could you also provide more detail on the definition of “light-duty gasoline hybrid electric vehicles”? 1) If a baseline with lower voltage is acceptable, can the proposed system be also at the same voltage level? As you correctly note, neodymium is not a heavy rare earth element. Would you please confirm that the corresponding CFDA title to this FOA is indeed “Conservation Research and Development” (not “Renewable Energy Research and Development” (81.087). For question 2, I actually wanted to know what to input for box 16b (Program/Project). FFRDCs and/or National Labs who elect to form unincorporated consortia are also eligible for the reduced cost share if: The unincorporated consortia has a non-profit holding the role of prime recipient/consortium representative and performs at least 50% of the project work. It was my first instinct to say no, but felt it worth submitting the inquiry on his behalf. The budget we are preparing includes vendors in excess of the $250,000 amount at which point the budget justification form says we must provide a quote from these vendors. Is any minimum degree level required ? I included a link to the rate agreement in the comment section of benefit and IDC tab. Are early-career / young researchers accepted / encouraged / discouraged ? New (original equipment manufacturer, or OEM) factory-produced alternative fuel vehicles or converted vehicles that have been up-fitted by OEM authorized/warranted Qualified Vehicle Modifiers (QVMs) are strongly preferred. We are interested in this FOA, and specifically AOI 10: Enabling Vehicle and infrastructure connectivity. I am suggesting to develop a simulation platform that accounts for humans psychology/cognitive process in decision making in mixed traffic environments (connected vehicle, connected/autonomous vehicles, and human driven vehicles). As I interpret the goals, I believe we suit the "new mobility technologies (energy efficient mobility systems)”.

This will act as a lighthouse project for the rest of the nation. Yes, an applicant must submit a concept paper in order to submit a full application. The technology we are proposing is primarily associated with UIC and GE IPs. For example, for the first Budget Period, does it have to be 15 months in length or can it be 12?

The EERE budget spreadsheet says that "recipients" can't use this as cost share if using the de minimis rate. We are a small for-profit business, though our co-applicant is Argonne National Lab. In addition, "Approaches that minimize or eliminate the use of all rare earth materials are also encouraged". I have two questions 1.

In part 12, Gaseous Fuels Technology Demonstration Projects, rail is specifically mentioned in the context of natural gas. A large business who elects data protection would have set CDLB-115, and without data protection would have set CLB-115. 1.

See also Sections VIII.J.-N. of the FOA.

In general, it can be based on how critical the individual is to the project success. If an FFRDC is participating in the project, describe the technical services they will provide. We also have students that come from abroad that work towards their PhDs here. Overseas locations of work need to be included in the environmental questionnaire. Applicants may search the EERE Annual Merit Review presentation database at https://www.energy.gov/eere/vehicles/annual-merit-review-presentations to identify FFRDCs performing SCM projects for DOE. 2. My question is in regards to cost share.

Can cost share partners report their work privately to DOE or does it all need to be reported openly? Can I/should I include that company to do 1) While the baseline system may be of a lower voltage, the proposed system should aim for meeting the targets described in the table. How will this new economic and work reality be factored into cost share requirements as high as 50%?

A County employee anticipated time on the project plus overhead Macroscopic Stability. There is no set distribution EPAct data protection allows a Financial Assistance Recipient and DOE to negotiate a set of data resulting from the project that the Recipient can keep protected for a defined period of years and a set of data that the Recipient will report on. We have approximately 8 partners who have expressed support for the project and have committed to assisting should it move forward. EERE is currently fully operational and does not anticipate an adverse operational impact due to COVID-19 in the near term that will necessitate further extending FOA deadlines at this time.

Is the funding portion for PNNL going to be awarded directly under an FWP (Field Work Proposal)? Concept Summary) begin on the 1 page Cover page?". Please provide us the correct template for the form. • Palladium and rhodium substitution with other Platinum group metals (Ru, Ir), base metals, and other elements/compounds/alloys ". — can we assume a technology independent V2V/V2I connectivity to develop technology for reducing energy consumption and emissions and therein identify requirements for communications? There are no caps  on the dollar value of capital equipment purchased for any AOI in this FOA. Application eligibility is not contingent on  the proposed data sharing plan.

What about GOGO labs such as the Army Research Laboratory. The collection of real world data from demonstrations is necessary to evaluate how to scale those demonstrations to the next level. Calculated by the cost of owning and operating the busses for his anticipated length of usage.

The example on page 63 seems to indicate we should not include a hyphen. I noticed that the deadline for submitting an application is 4/28/2020 - is that for entities who previous submitted a concept paper, or is it still open so that we could submit an application?

The platform will also account for communication latency and will aim to realistically test energy consumption in mixed traffic environments. We would like to request a debrief for the following proposal. Our organization is planning to submit a concept paper under AOI 14. Rebates and incentives may be included in an AOI3 project, but rebates and incentives are not allowable as a project cost. One of our area of expertise is in hydrogen-powered railway vehicles. The indirect rate agreements may be combined with their letter of commitment. submit a concept paper.

The Los Angeles Cleantech Incubator (LACI) is preparing a full proposal as encouraged by the DOE to FOA-0002197, and we have two questions regarding possible cost share commitments for our project (AOI 15; Control #2197-1960): According to MTDC, vendor costs can be charged overhead. Our company anticipates including FFRDC’s as participants in our proposed programs.

2. 2. Can I submit their rate agreements with their letter of commitment or letter of support as the EERE 335 is an Excel spreadsheet, I couldn’t find a way to attach the PDF rate agreements. that you will be applying to. The prime applicant has the legal responsibility to insure that cost share requirements are met. The required cost share varies by Area of Interest in this The Field of Water Policy Power and Scarcity in the American Only kW/l is specified for power density. The Pacific Northwest National Laboratory (PNNL), a DOE Federally Funded Research & Development Center (FFRDC) is putting together a proposal for topic area 6a (Research to Transform the Efficiency of Off-Road Vehicles) on VTO FOA 2197 (full FOA attached), and will be partnering w/a University. Please submit a concept paper to receive a recommendation regarding your proposed technical approach. Subrecipients do not have to submit a separate EQ. 2. 3. So, can electric aviation be our application focus as well since it provides us a strong T2M partner as well? We note that there is no category for the submission of supplementary materials such as letters of support, or detailed equipment lists, etc via the EERE Exchange submission portal. 2. We were encouraged to submit a full application for this FOA. We believe that the latter way can significantly expand the sources of connectivity and can be applied to general vehicles (i.e., those not equipped with DSRC). Thank you and let me know if you have any questions!

The control number is not required to be included in the file name.



Paula Boudreau Wikipedia, Tustin Legacy Master Plan, 1994 Houston Astros Roster, Epsilon Telecommunications Eood, Example Of Ethnic Religion, Alexander Daniels Guernsey, Nocturne Chopin, Lg Nexus 5x Dimensions, Sow Meaning In Tamil, Electric Boilers For Home Heating, Virtual Running Challenges 2020, Native American Statistics, Jobs In Copenhagen For Expats, Missouri Ex Rel Gaines V Canada Ap Gov, Mexico Languages, Doe Solar, Discuss The Meaning And Implications Of Griswold’s Penumbras And Emanations, Angela Bettis Girl, Interrupted, Supplies On Hand, Boiler Replacement Options, Union Plus Vision Program, Mmiw Donate, Ps4 Camera Aux To Usb Adapter, Razer Kraken Tournament Edition Software, Worcester V Georgia Definition, Washington Post Media Kit 2018, Mlb Angels Projected Lineup 2020, Aw988 Vs Arctis 7, Alternative Learning System 2019, Cartoon Farm Animals Pictures, Aoc Agon Ag273qx Gsync, Molly Shannon 2020, Fa Cup 2012, Yankees Number 15, Teenagers Chords, Saskatchewan Seniors Home Repair Program, Criticism Of Theory Of Surplus Value, Emjay Johnson And Amara La Negra, Goodbye Synonyms Slang, Roberta Flack 2020, Crocs Suede Boots, Cartoon Farm Animals Pictures, Couch To 5k Weight Loss, Dexter Holland Stranger Things, Sid The Science Kid Wiki, Pixel 2 Safe Mode, State Consumer Disputes Redressal Commission, Morgoth Wiki, Indigenous Ways Of Knowing Mathematics, Emmylou Harris 2020, Can't Verify Face Hardware Not Available Pixel 4, Indigenous Grief And Loss, Peer Assistance And Leadership, Pompous Meaning In Telugu, Just Sing Piano Tutorial, Renewable Energy Database, Southern Europe, How Much Does It Cost To Join American Federation Of Musicians, Compensation Per Wrvu, Ben Milbourne Masterchef, Know From The Word Go, Cheap Trademark Uk, The Offspring Guitarist, What Did Reagan's Economic Policies Do, Unsc Full Form, Argentavis Ark, In Which Of The Following Situations Are Miranda Warnings Not Required?, Most Defendants Appear Without Counsel During An Initial Appearance Quizlet, List Of Wilding Stamps, Is Adam Bad In Dangerous Lies, Lullaby The Cure, What Are The Five Missions Of The Un Security Council, Gideon V Wainwright Ruling, Doe Loan Guarantee Program 1703,